Sunday, October 6, 2019

Final project Assignment Example | Topics and Well Written Essays - 1750 words

Final project - Assignment Example A proper analysis will provide an efficient project plan that provides well for, the work breakdown structure, methodology, work packages and the estimated time required to complete the project at hand. Risk plan for the whole project will also be designed and implemented for the foreseen risks that could hamper the successful delivery of the project. Unmitigated risks in the construction industry have cost significant loss of property and life. The financial loss can be in terms of delay and over expenditure. Some of the serious risks that must have a proper management plan include design changes, cost overrun, project process approval, safety and the conditions of the sites among others. The project will be divided into three major activities namely preparation, lifting and reinforcing the building. The preparation will involve the following activities i.e. plans and permits, assembly of machines, cleaning of the soil, temporal removal of ducts, removal of the floor, removal of the walls, installation of ducts system back, and supplying of heat to restore warmth. During these activities, the residents will not be required to vacate their houses but there will be temporal disruption of their normal services. This phase will take an estimated 27 days. The lifting phase will include the following activities, assembly of the machinery, removing of the porch, installation of the jacks, lifting of the building and finally, transfer of the soil to another place This phase will take an estimated 6 days to complete. The final phase will include activities such as additional excavation, foundation replacement, lowering of the building, framing, refitting of the furnace, and finishing. This phase will take 11 days to finish. Figure 2.0 shows the relationship between the activities projected to finish the project. The diagram also outlines the resources assigned to each activity and the flow in which the activities will be carried out.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.